Meltho International School

June 2023
Project Details
  • Project Date: June 2023
Project Description

Safety is at the heart of every educational space, and at Meltho International School, Bainar was tasked with delivering a firefighting system that meets the highest protection standards.Our work began with a detailed assessment of the school’s layout and occupancy needs, ensuring that every classroom, corridor, and facility was within rapid reach of firefighting equipment. We then designed and installed a complete protection system, including fire hose cabinets, portable extinguishers, and a robust piping network, all linked to a dedicated fire pump room.In addition, advanced alarm systems were integrated to provide early detection and immediate alerts, enabling swift action in the event of an emergency. Every component was sourced from certified suppliers and installed in compliance with international safety codes.The result is a reliable, easy-to-operate firefighting system that gives students, teachers, and parents peace of mind. This project reflects Bainar’s commitment to safeguarding educational environments, where safety is as vital as learning.

Related Projects

Spanish Village Villas
Spanish Village Villas

In Spanish Village, every villa tells a story of style and comfort — and Bainar ensured the cl...

Arabica Cafe (Grand Majidi Mall-Empire-Boluvard)
Arabica Cafe (Grand Majidi Mall-Empire-Boluvard)

Bainar Company successfully executed the design, supply, and installation of central air conditionin...

Khutar Restaurant
Khutar Restaurant

Bainar delivered a customized air conditioning system for Khutar Restaurant in Mosul, designed to pr...